How to Prepare Your Store for Arcade Machine Delivery

2026-Nov-06 Visits:55 Leave a message

How to Prepare Your Store for Arcade Machine Delivery

Ordering commercial arcade machines is an exciting step when opening a new claw machine store, game room or entertainment venue. However, purchasing the equipment is not the final preparation task.

Before the machines arrive, the venue should be ready to receive them. Doorway measurements, unloading access, floor conditions and equipment placement can all affect the delivery process.

This guide explains how to prepare your store before your arcade machines are shipped.

1. Measure the Entrance and Access Routes

One of the first things to check is whether the machines can physically enter the venue.

Do not measure only the main entrance. Consider the entire route from the unloading point to the final machine location.

Check:

  • Main entrance width and height

  • Hallway width

  • Doorway clearance

  • Elevator dimensions, if applicable

  • Stairways and turning areas

  • Loading dock access

  • Any narrow corners or obstacles

For larger arcade cabinets, the delivery route may be more restrictive than the final display area.

Ask your supplier for the packed and unpacked dimensions of each model. If a machine is shipped in a crate or carton, use the packed dimensions when checking access.

2. Confirm the Available Floor Space

Measure the area where each machine will be placed.

The footprint of a machine is important, but the surrounding space also matters. Customers need room to approach and use the equipment, while staff may need access for restocking, cleaning and maintenance.

Prepare a layout that identifies:

  • Machine positions

  • Customer walkways

  • Entrance and exit routes

  • Waiting areas

  • Prize display areas

  • Staff access space

Avoid filling every available corner with machines. A comfortable layout can make the venue easier to navigate and operate.

ac2a01d7cd7eb37a30f1fc466b1a7c75 (1).jpg

3. Check the Floor and Installation Area

Before delivery, inspect the floor condition in the planned equipment area.

Consider whether the floor is level, clean, dry and suitable for the equipment. For large or heavy machines, ask the manufacturer for the machine's weight and have the building manager or a qualified professional confirm that the floor can safely support the intended load.

If the venue has raised platforms, ramps or unusual floor surfaces, discuss these conditions with the relevant professionals before delivery.

4. Arrange the Unloading and Delivery Point

Delivery vehicles need a suitable place to stop and unload.

Confirm the following details before shipment:

  • Whether the building has a loading dock

  • Whether delivery vehicles can access the location

  • Whether unloading equipment or extra labor is needed

  • Whether the building requires delivery appointments

  • Whether there are restrictions on delivery hours

  • Whether access permits must be arranged

For shopping malls, commercial buildings and multi-tenant properties, contact property management in advance. Some locations have specific delivery procedures.

5. Prepare the Final Machine Layout

A floor plan helps everyone understand where each machine should go.

You do not need professional architectural drawings to start. A simple sketch with accurate measurements can be useful.

Include:

  • Total venue dimensions

  • Machine model names and quantities

  • Machine dimensions

  • Door and window positions

  • Walkways

  • Power outlet locations

  • Storage and staff areas

If you are ordering several types of machines, label each planned position. This can help prevent confusion when the equipment arrives.

6. Confirm Power and Network Requirements

Before delivery, check the electrical specifications of the machines and arrange the necessary power access.

Some equipment may also require network connectivity or other connections, depending on its configuration.

Confirm these details with your supplier before shipment. Electrical work should be assessed and completed by qualified local professionals.

7. Coordinate the Delivery Schedule

A new venue may involve several suppliers, contractors and building-management teams.

Coordinate the machine delivery date with the readiness of the venue. Ideally, the floor, entrance, unloading area and electrical preparation should be completed before the equipment arrives.

Ask your supplier to confirm:

  • Estimated shipping and delivery schedule

  • Number of packages

  • Packed dimensions and weights

  • Shipping marks or package identification

  • Documents required for receiving the shipment

Keep the order list available so you can check the delivered packages against the shipment information.

H9880ccd3c3ef4721ab887d7a985e2088M (1).jpg

8. Check the Packages When They Arrive

When the shipment reaches the destination, inspect the outer packaging before signing the delivery documents, following the carrier's procedures.

Look for visible damage, missing packages or signs of mishandling. Photograph any concerns and report them promptly to the carrier and supplier.

After unpacking, compare the received equipment with the order details and follow the manufacturer's inspection and operating instructions.

9. Prepare a Receiving Checklist

Use this checklist before the machines arrive:

  • Entrance and hallway measurements confirmed

  • Packed machine dimensions checked

  • Floor area measured

  • Floor suitability reviewed

  • Unloading location arranged

  • Building delivery rules confirmed

  • Final machine layout prepared

  • Power requirements reviewed

  • Delivery schedule confirmed

  • Receiving staff or support arranged

Frequently Asked Questions

Q1: What dimensions should I check before ordering arcade machines?

Check both the machine dimensions and the packed dimensions. Also measure the entire access route, including entrances, hallways, elevators and turning areas.

Q2: Should I prepare the store before the machines are shipped?

Yes. Preparing the venue in advance can help reduce delivery delays and make equipment receiving more organized.

Q3: Can a supplier help with the store layout?

Many manufacturers can provide product dimensions and layout-planning support. Ask what planning services are included before placing your order.

Q4: What should I do if the machine packaging is damaged?

Photograph the damage, record the package condition and contact the carrier and supplier promptly. Follow the applicable shipping claim procedures.

Plan Your Arcade Equipment Project with Fanhong

Fanhong Arcade Factory is a commercial arcade equipment manufacturer based in Panyu, Guangzhou, China. We supply claw machines, capsule machines and other entertainment equipment for overseas business buyers.

Our team can help buyers review machine options, product dimensions and venue layout requirements before ordering.